Ingress/Egress South of Palermo 115 kV Project (Streambed Alteration Agreement No. 1600-2017-0274-R2)

11 Documents in Project

Summary

SCH Number
2017042051
Lead Agency
Public Utilities Commission (California Public Utilities Commission)
Document Title
Ingress/Egress South of Palermo 115 kV Project (Streambed Alteration Agreement No. 1600-2017-0274-R2)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2017-0274-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, PG&E Company. Five existing low-water crossings will be used to cross three streams for the South of Palermo Reconductoring Project. Ground access to this segment of the project will occur during the dry season (May 1 to October 31), at which time the crossings are likely to be dry. Matting within the existing road prism may still be required to facilitate use. Mattin would be installed using flatbed truck and front end loader. The crossings would be utilized by pickup trucks, line trucks, truck mounted drilling equipment, and cranes. Minor trimming of overhead vegetation may be necessary to allow access for construction equipment. Trimming of shrubs and overhead vegetation will result in the temporary disturbance of 0.091 acres (200 linear feet) of riparian vegetation along the existing dirt road/crossings. Project activities are scheduled to commence in May 2018 and conclude by Nov. 2018, with approx. 5 work days on the project site in order to complete project activities.

Contact Information
Patrick Moeszinger
CDFW
1701 Nimbus Road, Suite A
Rancho Cordova, CA 95709

916-358-2850

Location

Cities
Marysville Yuba City
Counties
Butte Sutter Yuba
Cross Streets
SR 70
Zip
95968,9590
State Highways
70
Township
12N
Range
4E
Section
21
Base
MD

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
1701 Nimbus Road, Suite A, Rancho Cordova, CA 95709

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No