Rehabilitation of El Portal / Trousdale Channel and Nine Flap Gates on Sanchez Lagoon Project

2 Documents in Project

Summary

SCH Number
2017042026
Lead Agency
City of Burlingame
Document Title
Rehabilitation of El Portal / Trousdale Channel and Nine Flap Gates on Sanchez Lagoon Project
Document Type
NOD - Notice of Determination
Received
Posted
6/8/2017
Present Land Use
Anza Point South (APS), Inner Bayshore (IB)/Industrial and Office Use, Community Park
Document Description
The City proposes two stormwater maintenance projects; the Rehabilitation of the El Portal / Trousdale Channels and Nine Flap Gates on Sanchez Lagoon. These projects are combined because they are both involve maintenance on the City of Burlingame stormwater infrastructure that have similar work requirements which could be bundled together into one construction contract. The Rehabilitation of El Portal/Trousdale Channel will consist of multiple concrete repairs in the trapezoidal flood control channel, totaling 15,000 sq. ft. The Nine Flap Gates to be installed on existing stormwater culverts around Sanchez Lagoon, Flap gates would improve the current operational problems plaguing the lagoon like sedimentation and flow reversal.

Contact Information

Name
Martin Quan
Agency Name
City of Burlingame
Contact Types
Lead/Public Agency

Location

Cities
Burlingame
Counties
San Mateo
Cross Streets
Hwy 101, Adrian Road, Rollings Road, CA Drive, Bayshore Road
Zip
94010
State Highways
101
Railways
Caltrain and BART
Airports
SF Int'l
Schools
San Mateo County ROP
Waterways
El Portal/Trousdale Channel and Sanchez Lagoon

Notice of Determination

Approving Agency
City of Burlingame
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print