Rehabilitation of El Portal / Trousdale Channel and Nine Flap Gates on Sanchez Lagoon Project

2 Documents in Project

Summary

SCH Number
2017042026
Lead Agency
Burlingame, City of (City of Burlingame)
Document Title
Rehabilitation of El Portal / Trousdale Channel and Nine Flap Gates on Sanchez Lagoon Project
Document Type
NOD - Notice of Determination
Received

Document Description
The City proposes two stormwater maintenance projects; the Rehabilitation of the El Portal / Trousdale Channels and Nine Flap Gates on Sanchez Lagoon. These projects are combined because they are both involve maintenance on the City of Burlingame stormwater infrastructure that have similar work requirements which could be bundled together into one construction contract. The Rehabilitation of El Portal/Trousdale Channel will consist of multiple concrete repairs in the trapezoidal flood control channel, totaling 15,000 sq. ft. The Nine Flap Gates to be installed on existing stormwater culverts around Sanchez Lagoon, Flap gates would improve the current operational problems plaguing the lagoon like sedimentation and flow reversal.

Contact Information
Martin Quan
City of Burlingame
501 Primrose Road
Burlingame, CA 94010

650-558-7245

Location

Coordinates
37°36'8.16"N 122°22'36.04"W
Cities
Burlingame
Counties
San Mateo
Cross Streets
Hwy 101, Adrian Road, Rollings Road, CA Drive, Bayshore Road
Zip
94010
State Highways
101
Railways
Caltrain and BART
Airports
SF Int'l
Schools
San Mateo County ROP
Waterways
El Portal/Trousdale Channel and Sanchez Lagoon

Notice of Determination

Approving Agency
City of Burlingame
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
501 Primrose Dr., Burlingame, CA 94010

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes