Massaro Stream Crossing Projects (Lake or Streambed Alteration Agreement No. EPIMS-51132-R1)

60 Documents in Project

Summary

SCH Number
2017042022
Lead Agency
Humboldt County
Document Title
Massaro Stream Crossing Projects (Lake or Streambed Alteration Agreement No. EPIMS-51132-R1)
Document Type
NOD - Notice of Determination
Received
Posted
10/7/2024
Document Description
The Project is limited to three encroachments. The three proposed encroachments are to upgrade existing culverts or upgrade crossings. Work for these encroachments will include excavation, removal of the existing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. Bank slopes that are restored shall be pulled back at no greater than 2:1. Slopes shall be seeded and stabilized.

Contact Information

Name
Joshua Gruver
Agency Name
CA Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Dinsmore
Counties
Humboldt
Regions
Northern California
Cross Streets
approximately 1.4 miles north of the town of Dinsmore
Parcel #
208-251-006-000
Waterways
Bear Creek - Mad River watershed
Township
2N
Range
5E
Section
33
Base
Humboldt
Other Location Info
The Project to be completed is located within the Bear Creek - Mad River watershed

Notice of Determination

Approving Agency
CA Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building 3015 H Street Eureka, CA 95501 Contact: Steven Lazar Phone: 707-445-7245

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print