Glover Water Diversion and Stream Crossing Projects (Lake or Streambed Alteration Agreement No. EPIMS-HUM-34432-R1C)
63 Documents in Project
Summary
SCH Number
2017042022
Lead Agency
Humboldt County
Document Title
Glover Water Diversion and Stream Crossing Projects (Lake or Streambed Alteration Agreement No. EPIMS-HUM-34432-R1C)
Document Type
NOD - Notice of Determination
Received
Posted
8/7/2023
Document Description
The Project is limited to two (2) encroachments. One (1) encroachment is for the removal of
unused water diversion infrastructure from an unnamed tributary to Connick Creek. Work will include removal of the
existing structure, any poly pipe, and backfilling of the excavated pit with clean rock. The second encroachment is to
restore and reconnect a section of altered stream channel and install a rocked ford crossing that will span a minimum of
10 linear feet in channel length. Work for this encroachment will include excavation of road fill, removal of water tanks,
recontouring of the stream channel and constructed water tank landing pad, reconnection of the affected stream reach to
the upstream and downstream channel, and construction of a properly sized rock armored ford crossing on a portion of
the impacted stream reach.
Contact Information
Name
Joshua Gruver
Agency Name
CA Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Address
Phone
Location
Coordinates
Cities
Garberville
Counties
Humboldt
Regions
Northern California
Cross Streets
approximately 2.7 miles west of the town of Garberville
Parcel #
222-081-004
Waterways
Connick Creek - South Fork Eel River watershed
Township
4S
Range
3E
Section
28
Base
Humboldt
Notice of Determination
Approving Agency
CA Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building
3015 H Street
Eureka, CA 95501
Contact: Steven Lazar
Phone: 707-445-7245
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.