Furber Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. EPIMS-HUM-21593-R1)

62 Documents in Project

Summary

SCH Number
2017042022
Lead Agency
Humboldt County
Document Title
Furber Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. EPIMS-HUM-21593-R1)
Document Type
NOD - Notice of Determination
Received
Posted
4/13/2022
Document Description
The project is limited to three encroachments. One encroachment is for water diversion from Thompson Creek a fish bearing stream downstream from the point of diversion (POD). Water is diverted for micro-hydro power generation and domestic use including 13,500 gallons of storage. All water diverted for power generation is returned to the stream approximately 150 downstream of the POD. Work for the water diversion will include use and maintenance of the water diversion infrastructure. The two other proposed encroachments are to upgrade failing and undersized stream crossings. Work for these encroachments will include excavation, removal of the failing crossings, replacement with new properly sized crossings, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information

Name
David Manthorne
Agency Name
California Department of Fish & Wildlife
Job Title
Senior Environmental Scientist Specialist
Contact Types
Responsible Agency

Location

Cities
Dinsmore
Counties
Humboldt
Regions
Northern California
Cross Streets
approximately 4.6 miles south of the town of Dinsmore
Waterways
Eel River watershed
Township
01N
Range
05E
Section
34
Base
Humboldt

Notice of Determination

Approving Agency
California Department of Fish & Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building 3015 H Street Eureka, CA 95501 Contact: Steven Lazar Phone: 707-445-7245

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print