Givins Bellflower Farms Domestic Water Diversion (Lake or Streambed Alteration Agreement No. 1600-2020-0353-R1)

62 Documents in Project

Summary

SCH Number
2017042022
Lead Agency
Humboldt County
Document Title
Givins Bellflower Farms Domestic Water Diversion (Lake or Streambed Alteration Agreement No. 1600-2020-0353-R1)
Document Type
NOD - Notice of Determination
Received
Posted
2/22/2021
Document Description
The project is limited to one encroachment (Table 1). The encroachment is for water diversion from an unnamed spring. Water is diverted for domestic use. Work for the water diversion will include use and maintenance of the water diversion infrastructure

Contact Information

Name
Monty Larson
Agency Name
CDFW
Contact Types
Responsible Agency

Location

Cities
Phillipsville
Counties
Humboldt
Regions
Northern California
Other Location Info
The project is located within the South Fork Eel River watershed, approximately 1.25 miles north of the community of Phillipsville, County of Humboldt, State of California; Section 12, T03 south, R03 east, Humboldt Base and Meridian, in the Miranda U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number (APN) 214-121-12; latitude 40.2273 N and longitude 123.7873 W at the point of diversion (POD) located on an adjacent property (APN: 212- 211-008).

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building 3015 H Street Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print