Estrella River Bridge on River Grove Drive Rehabilitation Project

3 Documents in Project

Summary

SCH Number
2017041075
Lead Agency
San Luis Obispo County
Document Title
Estrella River Bridge on River Grove Drive Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
6/22/2017
Present Land Use
ag and res suburban
Document Description
The county proposes to rehabilitate the existing structurally deficient bridge on River Grove Dr over the Estrella River in the community of Whitley Gardens, in the North County, Shandon-Carrizo North planning area. The proposed rehabilitation includes demolition and disposal of the existing abutments, construction of new abutments, temporary repositioning of the historic Parker steel truss, and construction of temporary timber truss supports. Other project components include removing, and disposing of the existing timber pedestrian walkway structure and concrete slab deck, installation of a new cast in place continuous concrete slab deck, and repainting the unmodified bridge elements. Construction staging areas will be established within the existing River Grove.

Contact Information

Name
Kristie Haydu
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency

Location

Cities
Paso Robles
Counties
San Luis Obispo
Cross Streets
Estrella Rd/River Grove Dr
Zip
93446
State Highways
46
Schools
Phillips Freedom
Waterways
Estrella River
Township
26S
Range
14E
Section
19
Base
MDBM
Other Location Info
Whitley Gardens

Notice of Determination

Approving Agency
San Luis Obispo County Board of Supervisors
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print