Pete Mellinger Alamo River Trail Phase II

2 Documents in Project

Summary

SCH Number
2017041073
Lead Agency
Holtville, City of (City of Holtville)
Document Title
Pete Mellinger Alamo River Trail Phase II
Document Type
NOD - Notice of Determination
Received

Document Description
The 1.1 mile long trail project will extend northerly from Earl Walker Park and be constructed along the west and east sides of the Alamo River. An under crossing of roadway will occur at Zenos Road. Installation of two prefabricated pedestrian bridges over the Alamo River are proposed. The trail will be created through moderate grading and grubbing. The trail will be surfaced with native soil, decomposed granite, or crushed rock. The trail width will be kept at 10 ft in accordance with State development standards to accommodate pedestrians and bikers. A buffer zone between the trail and the Alamo River will be constructed using native plant material and landscaping.

Contact Information
Justina G. Arce
City of Holtville
121 West 5th Street
Holtville, CA 92250

(760) 337-3883

Location

Coordinates
32°48'26.6"N 115°23'"W
Cities
Holtville
Counties
Imperial
Cross Streets
Evan Hewes/Hwy 115
Zip
92250
Parcel #
mult
State Highways
115
Schools
HUSD
Waterways
Alamo River
Township
15E
Range
26
Section
15S

Notice of Determination

Approving Agency
City of Holtville
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
121 W. 5th Street, Holtivlle, CA 92250

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search