East Palm Canyon Drive over Palm Canyon Wash Bridge Rehabilitation

3 Documents in Project

Summary

SCH Number
2017041036
Lead Agency
Palm Springs, City of (City of Palm Springs)
Document Title
East Palm Canyon Drive over Palm Canyon Wash Bridge Rehabilitation
Document Type
NOD - Notice of Determination
Received
Posted
8/27/2018
Present Land Use
Transportation corridor classified as major thoroughfare in GP Circulation element

Document Description
The project is to widen the existing bridge at East Palm Canyon Drive over Palm Canyon Wash to 19 feet 3 inches on the south end and 2 feet 10 inches on the north end. In addition to widening the bridge, a seismic restrofit and rehabilitation of the bridge will occur to meet current safety standards. The nearby pedestrian bridge will also be rehabilitated with new decking and railings. Improvements to Araby Trail Parking Area will also be made, including paving the parking area, new interpretive signs and replacing a culvert.

Contact Information
Kai Bunn
Colorado River Basin Regional Water
73-720 Fred Waring Dr, Suite 100
Palm Desert, CA 92260

Phone : (760) 346-7491

Location

Coordinates
33°47'52.35"N 116°30'39.22"W
Cities
Palm Springs
Counties
Riverside
Cross Streets
East Palm Canyon Dr/Escoba Dr
Zip
92262
Total Acres
16
Parcel #
public ROW
State Highways
SR 111
Airports
Palm Springs Intl
Schools
Palm Springs USD
Waterways
Palm Canyon Wash, Tahquitz Creek
Township
4S
Range
4E
Section
25
Base
SB

Notice of Determination

Approving Agency
Colorado River Basin Regional Water Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
3200 East Tahquitz Canyon Way, Palm Springs, CA 92262

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search