Santa Felicia Dam Safety Improvement Project

5 Documents in Project

Summary

SCH Number
2017041005
Lead Agency
United Water Conservation District
Document Title
Santa Felicia Dam Safety Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/2/2022
Document Description
The project addresses two primary safety-related components of the Santa Felicia Dam: 1) replacement of the existing outlet works due to the potential for failure under seismic loading conditions and impacts associated with sedimentation near the intake tower; and 2) increasing the conveyance capacity of the existing spillway to sufficiently pass the Inflow Design Flood, which for the Santa Felicia Dam consists of the Probable Maximum Flood of 220000 cubic feet per second. The Replacement of the outlet works would also include installation of a new hydroelectric turbine. The project does not include an increase in the capacity of the reservoir.

Contact Information

Name
Philip Meyer
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Ventura
Regions
Countywide, Southern California, Statewide
Waterways
Lake Piru Reservoir, lower Piru Creek

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Ventura
Final Environmental Document Available at
https://www.unitedwater.org/wp-content/uploads/2020/09/Full-FEIR-1.31.19.pdf

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print