Simi Valley Concrete Products Facility Project (Lake or Streambed Alteration Agreement No. 1600-2016-0024-R5)

Summary

SCH Number
2017039019
Lead Agency
City of Simi Valley
Document Title
Simi Valley Concrete Products Facility Project (Lake or Streambed Alteration Agreement No. 1600-2016-0024-R5)
Document Type
NOD - Notice of Determination
Received
Posted
3/21/2017
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0024-R5, pursuant to section 1602 of the Fish and Game Code to the project applicant, Adams and Bennet Investments, LLC. The Applicant proposes to construct and operate the Simi Valley Concrete Products Facility located on a 7.11 acre site. This includes the construction of a single dry alley plant, an additional wet alley plant, a two-story office building, and a materials storage area. There is an existing recycling operation at the project site that will be relocated or completely removed. The southern portion of the site is located in and adjacent to the Arroyo Simi and consists of ill materials placed in the arroyo at some unknown time (pre-1995). The project includes the removal and disposal of these fill materials and the restoration of the arroyo to its approx. original configuration, including re-vegetation with native species. The new arroyo embankment will result in a net increase of 1.35 acres of riparian habitat compared to the existing condition of this north bank area.

Contact Information

Name
Christine Found-Jackson
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Simi Valley
Counties
Ventura

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.