Streambed Alteration Agreement No. 1600-2017-0030-R2 "Hatfield" THP

Summary

SCH Number
2017039008
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement No. 1600-2017-0030-R2 "Hatfield" THP
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2017
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0030-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Siller Brothers, Inc. represented by Wayne Helm. Project is limited to water drafting at an established drafting site on Rock Creek, a Class I stream. Water maximum draw is 100 gallons per minute, when flow is greater than 0.2 CFS. Additional work at the site includes reestablishment of a Class III watercourse channel to its original location and building a berm to re-direct sediment into native vegetation and away from connection into the creek. Both of these activities occur out of the stream channel. After operations and before winter period, an adjacent log landing, the existing water truck approach, and the Class III channel that is presently delivering sediment into Rock Creek will be packed with logging slash to mitigate sedimentation into Rock Creek.

Contact Information

Name
Sarah Lose
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Sierra

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print