Nixon Booster Pump Replacement

Summary

SCH Number
2017039001
Lead Agency
Valley County Water District
Document Title
Nixon Booster Pump Replacement
Document Type
NOD - Notice of Determination
Received
Posted
3/1/2017
Document Description
Proposed new booster pump station to replace old existing booster pump station. Demolish existing concrete pump pedestal and construct new concrete pad. existing RTU panel & AC transfer switch to be removed & installed in new booster pump station. New booster station will be approx. 26, x42'x12' to be enclosed in a masonry block building with wood roof and metal roofing panels. Potable water from the Clinton East & West Reservoirs will flow into a 24-inch diameter common header influent steel pipe that will tie into the existing distribution system. Potable water will flow to the new pump station and evenly distribute between five 12-inch suction-side steel pipes. Water will flow into all five operating vertical turbine pumps and be pumped out into five 10-inch discharge-side steel pipes at a time at peak demand. All six discharge pipes will tie back into one 24-inch diameter pipe and the flow will be measured via a 16-inch diameter magnetic flow meter installed in suction side of the pump station. The finished water will flow into the new 24-inch pipeline. A 16-inch diameter bypass pipe will recirculate finished water back to the suction header if the system pressure experiences higher than anticipated pressure due to surge in the system using high pressure surge anticipator valve.

Contact Information

Name
Jose Martinez
Agency Name
Valley County Water District
Contact Types
Lead/Public Agency

Location

Cities
Baldwin Park
Counties
Los Angeles

Notice of Determination

Approving Agency
Valley County Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print