Greenhorn Plant Project (EPIMS Notification No. NEV-45383-R2)

6 Documents in Project

Summary

SCH Number
2017032040
Lead Agency
Nevada County
Document Title
Greenhorn Plant Project (EPIMS Notification No. NEV-45383-R2)
Document Type
NOD - Notice of Determination
Received
Posted
5/31/2024
Document Description
The project consists of the yearly channel realignment of Greenhorn Creek from a braided, meandering streambed into a single channel to harvest the sand and gravel from the creek, during dry conditions. The realignment is accomplished by using an excavator to dig a new channel, starting at the bottom of the new channel, and installed at an upstream direction. The channel will be dug into the sand and gravel and will utilize as much of the existing meandering braided channel as possible. Depending on the amount of sand and gravel material deposited in the creek bed during the winter high water storm periods and customer demand, the channel realignment could be approximately 3.5 miles long. The volume of material moved during the trenching process could be up to 110,000 cubic yards of sand and gravel per year.

Contact Information

Name
Caitlyn Oswalt
Agency Name
CALIFORNIA DEPARTMENT OF FISH &WILDLIFE
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Nevada
Regions
Northern California
Parcel #
012-800-004-000
Other Location Info
Project is located at Greenhorn Creek, tributary Bear River; Project is located approximately 5 miles upstream from Rollins Reservoir

Notice of Determination

Approving Agency
CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Nevada
Final Environmental Document Available at
CDFW Region 2 Headquarters

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.