Conditional Use Permit 2017-002, Crop Production Services

3 Documents in Project

Summary

SCH Number
2017032022
Lead Agency
Glenn County
Document Title
Conditional Use Permit 2017-002, Crop Production Services
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2017
Present Land Use
Prior sugar beet plant/M /Industrial
Document Description
Crop Production Services, Inc. proposes an agricultural crop protection chemical/fertilizer storage facility for retail to local farmers. Crop Production Services (CPS) plans to remodel; the A-frame Structure called the Mixing Building (39,000 sq. ft.), concrete masonry unit building called the Package Warehouse (16,170 sq. ft.), Front Office (2,290 sq. ft.) and East Scale House (120 sq. ft.). At the outset of operations, CPS anticipates selling roughly 12,000 tons of dry fertilizer, 15,000 tons of liquid fertilizer, 30,000 gallons crop protection products, and 2,000 to 3,000 bags of seed annually. The volumes could increase by as much as 150-200% over the initial five years of operations.

Contact Information

Name
Andy Popper
Agency Name
Glenn County
Contact Types
Lead/Public Agency

Location

Counties
Glenn
Cross Streets
1st St and County Rd Y
Zip
95951
Total Acres
51+/-
Parcel #
032-260-006
State Highways
45, 32
Railways
Cal Northern RR
Schools
Hamilton City
Waterways
Stony Creek, Sacramento River
Other Location Info
Hamilton

Notice of Determination

Approving Agency
Glenn County
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print