The Grove Residential Subdivision Removal Action Workplan (RAW) AKA: The Grove at Nevada City RAW

5 Documents in Project

Summary

SCH Number
2017032017
Lead Agency
Nevada City (City of Nevada City)
Document Title
The Grove Residential Subdivision Removal Action Workplan (RAW) AKA: The Grove at Nevada City RAW
Document Type
NOD - Notice of Determination
Received

Document Description
DTSC has approved a Removal Action Workplan (RAW) that authorizes activities to be conducted to remediate mine waste at the 15-acre Grove Subdivision site. Soil on the site is contaminated with Arsenic and Lead. Preparation and approval of the RAW by DTSC is pursuant to Chapter 6.8 of the CA Health and Safety Code. Activities to be conducted pursuant to the approved RAW include: 1) excavation and on-site disposal of approx. 1,700 cubic yards of mine waste (soil and rock); 2) on-site placement at the New Shaft location 3) burial of lead mine waste at a depth greater than 10 feet below ground surface (bgs); 4) dust control; 5) soil verification sampling; 6) placement of a 12" thick soil cap over mine waste; and 7) installation of drainage and erosion controls.

Contact Information
Randy Adams
DTSC
8800 Cal Center Dr.
Sacramento, CA 95826

916-255-3591

Location

Coordinates
39°15'10"N 121°2'4"W
Cities
Nevada City
Counties
Nevada
Cross Streets
Providence Mine Rd
Zip
95959
Total Acres
19.57
Parcel #
05-190-53
State Highways
49
Schools
Sear Creek ES
Waterways
Deer Creek
Township
16N
Range
8E
Section
13
Base
MDBM

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
8800 Cal Center Dr., Sacramento, CA 95826

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes