Railroad Safety Trail Project, Taft Street to Pepper Street (ER# 91375)

4 Documents in Project

Summary

SCH Number
2017031074
Lead Agency
City of San Luis Obispo
Document Title
Railroad Safety Trail Project, Taft Street to Pepper Street (ER# 91375)
Document Type
NOD - Notice of Determination
Received
Posted
5/25/2017
Present Land Use
roads, UPRR tracks, ROW, CHP facility/MD Residential, Office, ROW/neighborhood commercial, office, MD Res
Document Description
New 1,700 ft Class I & IV multi-use trail from Taft Pepper Street( 12-ft path w/ 2-ft paved shoulders). Includes: path construction; bridge over UPPR tracks; retaining walls/abutments; tree removals; & re-striping California Blvd. vehicle travel lanes (decrease NB travel lanes from 2 to 1) and construction of right turn lane. Approx. 3.15 acres of disturbance (0.76 acre permanent, 2.16 acres temporary, & 0.28 acre of unpaved construction staging. Permanent or ROW take & temporary construction easements (UPRR, State, private property) needed.

Contact Information

Name
Shawna Scott
Agency Name
City of San Luis Obispo
Contact Types
Lead/Public Agency

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
California Blvd, Taft St, Phillips Lane, Pepper St
Zip
93401
Total Acres
3.15
Parcel #
001-052-004, -131-008
State Highways
101/1/227
Railways
UPRR
Schools
ES, HS, Public/private
Waterways
San Luis Obispo, Stenner, and Brizziolara Creeks
Township
30
Range
12
Section
26
Base
MD

Notice of Determination

Approving Agency
City of San Luis Obispo Architectural Review Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print