John Wayne Airport (JWA) General Aviation Improvement Program (GAIP)

3 Documents in Project

Summary

SCH Number
2017031072
Lead Agency
Orange County
Document Title
John Wayne Airport (JWA) General Aviation Improvement Program (GAIP)
Document Type
NOD - Notice of Determination
Received
Posted
6/26/2019
Project Applicant
County of Orange, John Wayne Airport

Document Description
The GAIP provides the framework for general aviation Improvements at the Airport. The GAIP assumes the phased replacement of the majority of existing facilities serving general aviation. The approved project, Identified as the Proposed Project In the Final Program EIR, provides for 2 Full Service Fixed Based Operators (FBOs); redevelopment of 1 Limited Service FBO (for a total of 2 Limited Service f: BOs on the Airport); correction of four existing non standard design features; provisions for an optional general aviation terminal and General Aviation Facility; capacity for approximately 354 based aircraft located in box hangars, community hangars, T-hangars, tie-downs and FBO apron spaces; flight schools; a self-service aircraft fueling station and aircraft wash rack; and minor modifications to Ingress and egress on the east side of the Airport (on Campus Drive).

Contact Information
Lea Choum
County of Orange
3160 Airway Avenue
Costa Mesa, CA 92626

Phone : (949) 252-5123

Location

Cities
Costa Mesa
Counties
Orange
Other Location Info
The GAIP would be implemented at J\NA, which Is within an unincorporated area of Orange County and a portion within the City of Costa Mesa boundary. Aviation activities are located south of Interstate ("I") 405, north of state Route ("SR") 73. west of MacArthur Boulevard, and east of Airway Avenue.

Notice of Determination

Approving Agency
County of Orange
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
John Wayne Airport, 3160 Airway Avenue, Costa Mesa, CA 92626

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2017031072   PDF 3696 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print