NRG Ellwood Battery Storage Project

2 Documents in Project

Summary

SCH Number
2017031067
Lead Agency
City of Goleta
Document Title
NRG Ellwood Battery Storage Project
Document Type
NOD - Notice of Determination
Received
Posted
7/6/2017
Present Land Use
GP: Public/quasi public; Z: Public works, utilities, and private service facilities
Document Description
The NRG Ellwood Battery Storage Project would include installation of one modular battery storage system with a capacity of 500 kw on the existing EGS site in western Goleta, CA. The project would connect with an existing SCE 16-kV distribution line, which connects to SCE's Isla Vista Substation to the south. No new above ground electrical transmission or distribution lines would be required. The required distribution voltage cable would run below grad through an existing underground conduit and would terminate at the base of an existing SCE distribution pole located immediately adjacent to EGS. Battery storage equipment would be blocked from public view by existing perimeter walls and vegetation.

Contact Information

Name
Jasch Janowicz
Agency Name
City of Goleta
Contact Types
Lead/Public Agency

Location

Cities
Goleta
Counties
Santa Barbara
Cross Streets
Las Armas Rd and Hollister Ave
Zip
93117
Total Acres
1.5
Parcel #
079-210-003
State Highways
US 101
Railways
SPRR
Schools
Ellwood ES
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
City of Goleta
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.