840 East Walnut Street Billboard

3 Documents in Project

Summary

SCH Number
2017031060
Lead Agency
City of Carson
Document Title
840 East Walnut Street Billboard
Document Type
NOD - Notice of Determination
Received
Posted
7/11/2017
Present Land Use
GP: Light industrial; Z: Manufacturing light
Document Description
The project is located on a 2.57-acre developed property that abuts the northern edge of the SR 91 freeway, in the northwest portion of the city of Carson. The proposed project involves the construction of a 56-ft tall, dual-faced, digital/LED billboard with associated infrastructure connections. Project operation would include the displaying of alternating LED advertisements on either side of the billboard and periodic maintenance of the billboard. The project does not propose to alter the existing on site light industrial uses (occupied by a Sunjin Shipping Warehouse and associated parking lot). Discretionary actions required by the project include a zone code amendment and development agreement with Carson and an Outdoor Advertising Display Permit from Caltrans.

Contact Information

Name
McKina Alexander
Agency Name
City of Carson
Contact Types
Lead/Public Agency

Location

Cities
Carson
Counties
Los Angeles
Cross Streets
Artesia Blvd and South Avalon Blvd
Zip
90745
Total Acres
2.57
Parcel #
7319-033-064
State Highways
I-110, I-405, SR 91
Airports
Compton/Woodley Airport
Schools
Ambler Ave ES

Notice of Determination

Approving Agency
City of Carson
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print