Seco Creek Trail ( aka Cherry Canyon Citizens' Trail)
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017031029
- Lead Agency
- La Canada Flintridge, City of (City of La Canada Flintridge)
- Document Title
- Seco Creek Trail ( aka Cherry Canyon Citizens' Trail)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/12/2018
- Present Land Use
- Open space with existing trails/open space
- Document Description
- The project site is a trail located in the City of La Canada Flintridge that begins near the bottom (lowest elevation) of Owl Trail, approximately 0.2 mile west of the Hampstead Rd trailhead, and terminates west of the Cherry Canyon Motorway. The City is seeking to legally permit, enhance, and expand an existing citizen's trail that has been created in the area designated Cherry Canyon Open Space. The proposed project would involve re-cutting and grading the existing trail and vegetation removal. Construction would also include an approximately five-foot retaining wall and several drainage features beneath the trail to allow storm water flows to pass under the trail.
- Contact Information
-
Susan Koleda
City of La Canada Flintridge
1327 Foothill Boulevard
La Canada Flintridge, CA 91011-2137
Phone : (818) 790-8881
Location
- Coordinates
- 34°11'34"N 118°12'30"W
- Cities
- La Canada-Flintridge
- Counties
- Los Angeles
- Cross Streets
- Along Owl Trail
- Zip
- 91011
- Total Acres
- 1
- State Highways
- 2, 210
- Schools
- La Canada HS
Notice of Determination
- Approving Agency
- City of La Canada Flintridge
- Approved On
- Final Environmental Document Available at
- City Clerk - 1327 Foothill Blvd., and City Library - 4545 N Oakwood Ave, La Canada Flintridge, CA
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.