Avenue 44 Low-Flow Crossing Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2020-0056-R6

3 Documents in Project

Summary

SCH Number
2017031021
Lead Agency
City of Indio
Document Title
Avenue 44 Low-Flow Crossing Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2020-0056-R6
Document Type
NOD - Notice of Determination
Received
Posted
3/7/2024
Document Description
The California Department of Fish and Wildlife (CDFW) has amended Lake and Streambed Alteration Agreement (1600-2020-0056-R6), pursuant to Fish and Game Code section 1602, the project Applicant, City of Indio. The Project is limited to the removal of the existing low-flow crossing and associated culvert system and replacement of the crossing with a newly-constructed 518-foot long and 78-foot wide, four lane bridge with sidewalks on both sides spanning from channel bank to channel bank (figure 2). The new bridge will be supported by four bridge pilings, new abutments, and channel slope protection, and a grade control structure and concrete access roads and associated concrete slope protection will also be constructed as part of the Project. Temporary water diversion structures will be installed, if needed, to convey stream flow during construction and removed postconstruction.

Contact Information

Name
Jacob Skaggs
Agency Name
Fish and Wildlife, Region 6
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Indio
Counties
Riverside
Regions
Southern California

Notice of Determination

Approving Agency
Fish and Wildlife, Region 6
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
City of Indio 100 Civic Center Mall Indio, CA 92201

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.