749/759 Ward Drive - Renovations and Lot Split (15-126-TPM-DP-DRB)

2 Documents in Project

Summary

SCH Number
2017031008
Lead Agency
Goleta, City of (City of Goleta)
Document Title
749/759 Ward Drive - Renovations and Lot Split (15-126-TPM-DP-DRB)
Document Type
NOD - Notice of Determination
Received
Posted
4/27/2017
Present Land Use
PU: Industrial business park/Z:Industrial research park/LU: Business park

Document Description
A tentative parcel map is requested to subdivide the existing lot into two separate lots. Proposed lot 1 would be 2.164 gross acres and would contain the building addressed as 749 Ward Drive. Proposed lot 2 would be 1.253 gross acres and would contain the building addressed as 759 Ward Dr. The parcel map will also include an approx 10 ft right of way dedication along the Ward Drive frontage. The project also requests approval of a development plan for the renovation of the existing development's buildings and parking lot. Preliminary earthwork quantities are estimated at 1,500 cy of cut and 1,000 cy of fill, with 250 yards of asphalt and base to be recycled onsite (net export of 250 cy).

Contact Information
Joe E. Pearson II
City of Goleta
130 Cremona Drive, Suite B
Goleta, CA 93117

Phone : (805) 961-7543

Location

Coordinates
34°25'44.0"N 119°49'20.4"W
Cities
Goleta
Counties
Santa Barbara
Cross Streets
Ward Dr and Ekwill St
Zip
93111
Total Acres
3.4
Parcel #
071-170-035, -014
State Highways
101, 217
Railways
SPRR
Airports
SBA
Schools
San Marcos HS
Waterways
Maria Ygnacio and SJ Creek and Pacific Ocean
Township
4N
Range
28W
Section
16
Base
SBBM

Notice of Determination

Approving Agency
City of Goleta Planning Commission
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
130 Cremona Drive, Suite B Goleta, CA 93117

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print