Operation of U.S. Marine Corps 1 Million Gallon Replacement Tank

Summary

SCH Number
2017028577
Lead Agency
State Water Resources Control Board
Document Title
Operation of U.S. Marine Corps 1 Million Gallon Replacement Tank
Document Type
NOE - Notice of Exemption
Received

Document Description
The State Water Resources Control Board (State Water Board) as the lead agency will be issuing a water supply permit. The U.S. Marine Corps constructed a 1,000,000 gallon water tank approximately 34 feet tall by 85 feet wide, with an inner tank 58 feet wide. A float system was installed inside each tank. The tank construction included 2 12-inch overflow pipes and 2 6-inch drain pipes that drops into a 5 foot by 9 foot precast inlet structure. An electrical transformer, control panel, and water testing station was also installed on site. 2 8-inch diameter inlet pipes and 2 12-inch diameter outlet pipes were installed. A 375 foot dirt access road, not ove 40 feet in width, a 24 foot wide paved service road that circles the tank, fencing, and security lighting was also installed. The old 1,000,000 gallon Camp Wilson water tank was demolished. Construction was completed in December 2016. The project will provide for the operation of these facilities.

Contact Information
Sean McCarthy
State Water Resources Control Board
San Bernardino District Office 464 W. 4th Street, Room 437
San Bernardino, CA 92401

909 383-4328

Location

Counties
San Bernardino

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301 - Class 1
Reasons for Exemption
Existing Facilities.