San Pablo Clearwell Replacement and Water Treatment Plant Rehabilitation Project

2 Documents in Project

Summary

SCH Number
2017028190
Public Agency
East Bay Municipal Utility District (EBMUD)
Document Title
San Pablo Clearwell Replacement and Water Treatment Plant Rehabilitation Project
Document Type
NOE - Notice of Exemption
Received
Posted
2/8/2017
Document Description
Demolition of the existing 5.4-million gallon San Pablo Clearwell open cut reservoir followed by construction of two 2.7-MG replacement concrete tanks within the basin of the existing clearwell and rehabilitation work at the San Pablo Water Treatment Plant and San Pablo Tunnel.

Contact Information

Name
David J. rehnstrom
Agency Name
East Bay Municipal Utility District
Contact Types
Lead/Public Agency

Location

Counties
Contra Costa
Other Information
300 Berkeley Park Boulevard

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15301(d);15302(c)
Reasons for Exemption
The project is exempt because it entails the replacement of an existing utility system and facilities involving no expansion of capacity. In addition, the project will be conducted in previously disturbed/developed areas and the new reservoirs will be located at the same site and will serve the same purpose and capacity as the replaced clearwell. Demolition activity will be necessary to clear the site before construction begins on the replacement reservoirs. The project will have no significant environmental effects relative to location, Cumulative Impact, Scenic Highways, and Significant Effect due to unusual circumstances, Hazardous Waste or Historical Resources, pursuant to Section 15300.2 of the CEQA Guidelines.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print