Tideland Use and Occupancy Permit to DOLE for Warehouse Space
1 Documents in Project
Summary
SCH Number
2017028188
Public Agency
San Diego Unified Port District
Document Title
Tideland Use and Occupancy Permit to DOLE for Warehouse Space
Document Type
NOE - Notice of Exemption
Received
Posted
2/8/2017
Document Description
The proposed project is a tideland use and occupancy permit to the DOLE Fresh Fruit Company, a Nevada Corporation for their use of approximately 4,339 square feet of non-exclusive warehouse space for the purpose of accessing two loading doors located within the National Distribution Center in the city of National City, California. The areas proposed for use and are currently and are proposed to be used only and exclusively for the purpose of warehousing, distribution, refrigeration, and an office facility, and for no other purpose of warehousing, distribution, refrigeration, and an office facility, and for no other purpose whatsoever without the prior written consent of the Executive Director of the District in each instance. The proposed project would not increase storage capacity or queuing time for trucks, but now to allow for additional truck trips. The Tenant would be responsible for compliance with all laws and regulations associated with the activities on or in connection with the above-described premises, and in all uses thereof, including those regulating storm water and hazardous materials. No new development, construction uses, or in case in the size of the Tenant's leasehold or the TUOP area is proposed or authorized as part of this TUOP.
Contact Information
Name
Juliette Orozco
Agency Name
San Diego Unified Port District
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Diego
Counties
San Diego
Other Information
1011 Anchorage Lane, San Diego, CA 92106
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
S:15301 C:1
Reasons for Exemption
The project is determined to be Categorically Exempt pursuant to CEQA Act Guidelines Section 15301 and Section 3.a of the District's Guidelines for Compliance with CEQA because the project is a TUOP for the use of warehouse space that would involve no expansion of use beyond that previously existing.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.