Hogan Dam Road over Bear Creek Low Water Crossing Conversion (New Bridge) Project (Lake or Streambed Alteration Agreement No. 1600-2018-0110-R2)

4 Documents in Project

Summary

SCH Number
2017022045
Lead Agency
Calaveras County
Document Title
Hogan Dam Road over Bear Creek Low Water Crossing Conversion (New Bridge) Project (Lake or Streambed Alteration Agreement No. 1600-2018-0110-R2)
Document Type
NOD - Notice of Determination
Received

Document Description
Project consists of the construction of a new bridge that will be approximately 80 feet long and approximately 25 feet wide. The roadway approaches on both sides will be reconstructed and widened to accomodate the new bridge. The roadway will xtend approximately 250 feet on both the north and south sides of the bridge. Retaining walls will be constructed along the north and south abutments. Construction includes excavation for the new bridge abutments and abutment spread footing foundations and placing gravel fill on the approaches.

Contact Information
Greg Hendricks
Central Valley Regional Water Board
11020 Sun Center Drive #200
Rancho Cordova, CA 95670

916-464-4709

Location

Coordinates
38°05'38.2"N 120°45'35.8"W
Counties
Calaveras
Cross Streets
Hogan Dam Rd
Zip
95252
Total Acres
1.25
Parcel #
050-008-013, 041, 042
Airports
Unnamed private air strip
Waterways
Bear Creek
Township
3N
Range
11E
Section
21-22
Base
MD
Other Location Info
Rancho Calaveras

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search