Hogan Dam Road over Bear Creek Low Water Crossing Conversion (New Bridge) Project (Lake or Streambed Alteration Agreement No. 1600-2018-0110-R2)
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017022045
- Lead Agency
- Calaveras County
- Document Title
- Hogan Dam Road over Bear Creek Low Water Crossing Conversion (New Bridge) Project (Lake or Streambed Alteration Agreement No. 1600-2018-0110-R2)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/11/2018
- Present Land Use
- GP:Future single fami res; Z: Gen AG
- Document Description
- Project consists of the construction of a new bridge that will be approximately 80 feet long and approximately 25 feet wide. The roadway approaches on both sides will be reconstructed and widened to accomodate the new bridge. The roadway will xtend approximately 250 feet on both the north and south sides of the bridge. Retaining walls will be constructed along the north and south abutments. Construction includes excavation for the new bridge abutments and abutment spread footing foundations and placing gravel fill on the approaches.
- Contact Information
-
Greg Hendricks
Central Valley Regional Water Board
Lead/Public Agency
11020 Sun Center Drive #200
Rancho Cordova, CA 95670
Phone : (916) 464-4709
Location
- Coordinates
- 38°05'38.2"N 120°45'35.8"W
- Counties
- Calaveras
- Cross Streets
- Hogan Dam Rd
- Zip
- 95252
- Total Acres
- 1.25
- Parcel #
- 050-008-013, 041, 042
- Airports
- Unnamed private air strip
- Waterways
- Bear Creek
- Township
- 3N
- Range
- 11E
- Section
- 21-22
- Base
- MD
- Other Location Info
- Rancho Calaveras
Notice of Determination
- Approving Agency
- Central Valley Regional Water Quality Control Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- N/A
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.