Hogan Dam Road over Bear Creek Low Water Crossing Conversion (New Bridge) Project (Lake or Streambed Alteration Agreement No. 1600-2018-0110-R2)
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017022045
- Lead Agency
- Calaveras County
- Document Title
- Hogan Dam Road over Bear Creek Low Water Crossing Conversion (New Bridge) Project (Lake or Streambed Alteration Agreement No. 1600-2018-0110-R2)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/23/2018
- Present Land Use
- GP:Future single fami res; Z: Gen AG
- Document Description
- Project is limited to removing one low water crossing (LWC) and replacing the crossing with a new bridge on Hogan Dam Road. Falsework in the channel will occur as needed to support construction of the single span bridge, 80' (feet) long by 25' (feet) wide. Construction will include retaining wall construction, new bridge foundations, and rocked slope protection for erosion control. Both approaches (North and South) will be reconstructed to tie into the new bridge.
- Contact Information
-
Talmadge Robinson
CDFW
1701 Nimbus Road, Suite A
Rancho Cordova, CA 95670
Phone : (916) 358-4035
Location
- Coordinates
- 38°05'38.2"N 120°45'35.8"W
- Counties
- Calaveras
- Cross Streets
- Gann Rd and Hunt Rd
- Zip
- 95252
- Total Acres
- 1.25
- Parcel #
- 050-008-013, 041, 042
- Airports
- Unnamed private air strip
- Waterways
- Bear Creek, Whiskey Creek, Dry Creek
- Township
- 3N
- Range
- 11E
- Section
- 21-22
- Base
- MD
- Other Location Info
- Rancho Calaveras
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 1701 Nimbus Road, Suite A, Rancho Cordova, CA 95670
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.