Main Canal Rehabilitation Project

2 Documents in Project

Summary

SCH Number
2017022044
Lead Agency
Patterson Irrigation District
Document Title
Main Canal Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
8/21/2017
Present Land Use
existing main canal
Document Description
The project includes the modernization and capacity recovery of three miles of PID's main conveyance system (reaches 1 through 5), ending at US 33 and Southern Pacific Railroad's right way. Reach 1 of the existing canal will be replaced with a new 195 CFS lined canal, reaches 2 and 4 with 195 CFS pumping plants and pipelines, reached 3 and 5 with 195 CFS lined canal, two new 195 CFS pump stations, decommissioning of sediment basins 3 and 5, decommissioning of pumping plants 3 and 5, canal reaches 2 and 4 will be decommissioned and removed from service, 9 aging laterals will be replaced, and 12 aging customer turnouts along the main canal will be replaced.

Contact Information

Name
Vince Lucchesi
Agency Name
Patterson Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Patterson
Counties
Stanislaus
Cross Streets
Las Palmas, Orange, Elm, Sycamore, and Fig Ave
Zip
95363
Total Acres
20
State Highways
33
Railways
SPRR
Schools
Las Palmas, Patterson HS
Waterways
San Joaquin River
Township
3S6RE
Range
Diablo
Section
58T3S

Notice of Determination

Approving Agency
Patterson Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print