Land Use Permit for a 225,950 sq. ft. Warehouse Structure, County File #LP16-2031

5 Documents in Project

Summary

SCH Number
2017022002
Lead Agency
Contra Costa County
Document Title
Land Use Permit for a 225,950 sq. ft. Warehouse Structure, County File #LP16-2031
Document Type
NOD - Notice of Determination
Received
Posted
8/10/2017
Present Land Use
Z: L-I, Light industrial/GP: LI, Light industry
Document Description
The applicant requests approval of a Land Use Permit for a 225,950 sq. ft. warehouse to be constructed in two adjoining vacant parcels located northwest of Evora Court at the western terminus of Evora Road. The proposed project includes a 1,003-foot eight-inch long, 265 foot wide, 42-foot six-inch tall warehouse with a driveway that wraps around the building, loading bays along the southern elevation of the building, and parking along the east, north, and west sides of the warehouse. The project also includes landscape plantings in the parking areas, along the edges of the project site, and around the building on the west, north, and east elevations. The property is located at 4000 Evora Road (approx. address in the Bay Point area of unincorporated Contra Costa County. (Zoning: L-I Light Industrial) (APN No. 099-160-026, 099-160-027).

Contact Information

Name
Stan Muraoka
Agency Name
Contra Costa County
Contact Types
Lead/Public Agency

Location

Counties
Contra Costa
Cross Streets
Evora Rd, Willow Pass Rd
Zip
94520
Total Acres
15.42
Parcel #
099-160-026, -027
State Highways
4
Railways
BART
Schools
Sun Terrace ES
Waterways
Mt. Diablo Creek
Other Location Info
Bay Point

Notice of Determination

Approving Agency
Contra Costa County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print