Heritage Bridge Replacement Project

3 Documents in Project

Summary

SCH Number
2017021078
Lead Agency
City of Chula Vista
Document Title
Heritage Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
1/24/2023
Document Description
The San Diego Regional Water Quality Control Board issued a Clean Water Act section 401 water quality certification (Certification No. R9-2023-0032) to the Project Applicant. The Applicant proposes to replace the existing Heritage Road Bridge over the Otay River to eliminate the bridge’s “Functionally Obsolete” designation and raise its Sufficiency Rating to above 80 by providing hydrologic adequacy and standard approaches, while meeting future traffic capacity demands and deck geometry standards for pedestrians and bicyclists.

Contact Information

Name
George W Geatz IV
Agency Name
San Diego Regional Water Quality Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Chula Vista
Counties
San Diego
Regions
Southern California
Cross Streets
Heritage Road
Zip
91911
Total Acres
21.6
Parcel #
64405010; 64405011; 64405012; 64406014; 64406124

Notice of Determination

Approving Agency
San Diego Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
The record associated with the San Diego RWQCB’s decision is available at 2375 Northside Drive, Ste. 100, San Diego CA 92108, ph. 619-521-1990 (Electronic File No./PIN 877382).

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print