Rio Bravo Hydro Sediment Management Project

3 Documents in Project

Summary

SCH Number
2017021050
Lead Agency
Olcese Water District
Document Title
Rio Bravo Hydro Sediment Management Project
Document Type
NOD - Notice of Determination
Received
Posted
2/6/2018
Present Land Use
LU: Ag, grazing, hydropower, res; Z: Rec/Forestry; GP: Res
Document Description
The Olcese Water District (OWD) proposes to Rio Bravo Hydro Sediment Management Project (Project), which involves the implementation of measures to manage sediment accumulation at the Rio Bravo Hydroelectric Project (Rio Bravo), Federal Energy Regulatory Commission Project No. 4129. Sediment management methods include sediment pass through (sluicing) and mechanical sediment removal. Mechanical sediment removal involves suction dredging in the Rio Bravo impoundment every 1-5 years and the use of excavators to remove sediment from the Rio Bravo canal every 5-10 years. For each mechanical sediment removal event, OWD estimates that approx. 10,000-34,000 cubic yards of sediment could be removed from the impoundment and approx. 5,000-10,000 cubic yards of sediment could be removed from the canal. Sediment would be stored in designated disposal areas on Rio Bravo property. Sluicing through the Rio Bravo sluiceway is triggered by flow criteria, upstream sediment transport, and/or natural turbid flow conditions, and may occur multiple times each year. OWD designed sluicing triggers to maximize sediment mobility and limit impacts to biological resources. OWD estimates that approx. 1,000-1,500 cubic yards of sediment would be displaced downstream during each sluicing event.

Contact Information

Name
Phillip Choy
Agency Name
SWRCB
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern
Cross Streets
Kern Canyon Rd (SR 178)
Zip
93306
Total Acres
140
Parcel #
397-020-24, 386-010-40, 397-020-...
State Highways
178
Waterways
Kern River
Township
29S
Range
30E
Section
6

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print