Palmdale Water District Water System Master Plan

4 Documents in Project

Summary

SCH Number
2017021042
Lead Agency
Palmdale Water District
Document Title
Palmdale Water District Water System Master Plan
Document Type
FIN - Final Document
Received

Document Description
PWD as the lead agency has prepared a draft EIR to provide the public and trustee agencies with info about the potential effects on the local and regional environment associated with implementation of the WSMP. The WSMP outlines a programmatic plan to meet water needs for PWD customers into 2040 and beyond by addressing existing system deficiencies and establishing new water infrastructure to meet future population growth. The WSMP projects the population in the PWD service area will double over the next 25 years. The goals of the WSMP are to provide cost-cost effective water services that meet water quality, quantity, system pressure and reliability requirements of PWD customers, improve existing PWD infrastructures, create future infrastructure to accommodate projected population growth, and ensure potable water supply can meet annual water demand over the next 25 years. The proposed project would implement the Capital Improvement Plan included in the WSMP. Implementation of actions under this WSMP would require the construction of various aboveground facilities and support infrastructure including storage tanks, pump stations, pipelines and wells. Projects to be implemented by 2020 are considered near-term project components and are analyzed at site-specific level. Projects addressed after 2020 are considered long-term projects. Additionally, PWD is proposing a HQ building expansion at its current HQ located at the corner of E. Avenue Q and 20th St to serve the water system in the long term (after 2020).

Contact Information
James Riley
Palmdale Water District
2029 East Avenue Q
Palmdale, CA 93550

661-456-1020

Location

Coordinates
34°35'15"N 118°5'38"W
Cities
Palmdale
Counties
Los Angeles
Cross Streets
East Avenue Q and 20th St East
Zip
93550
Total Acres
30,080
Parcel #
various
State Highways
SR 14, 138
Railways
Antelope Valley Line
Airports
Palmdale Regional
Schools
Temecula Christian
Waterways
CA Aqueduct, Anaverde Creek, Lake Palmdale, Palmdale Ditch
Township
6N
Range
11W
Section
19
Base
SB

Notice of Completion

Development Type
Water Facilities (pump stations, s Type, >5MG MGD)
Local Action
Use Permit
Project Issues
Cumulative Effects Landuse Growth Inducing Wetland/Riparian Water Supply Water Quality Vegetation Traffic/Circulation Toxic/Hazardous Solid Waste Soil Erosion/Compaction/Grading Social Sewer Capacity Schools/Universities Recreation/Parks Public Services Population/Housing Balance Noise Minerals Geologic/Seismic Forest Land/Fire Hazard Flood Plain/Flooding Drainage/Absorption Biological Resources Archaeologic-Historic Air Quality Aesthetic/Visual
Download CSV New Search