North School Reconstruction Project
4 Documents in Project
Summary
SCH Number
2017021031
Lead Agency
Hermosa Beach City School District
Document Title
North School Reconstruction Project
Document Type
NOD - Notice of Determination
Received
Posted
1/10/2019
Present Land Use
GP: PF, open space; Z: Unclass, open space. local coastal plan: Schools and parks
Document Description
The proposed project is the reconstruction of the North School site and entails the demolition of existing structures onsite, extending the site footprint eastward over approx. 0.09 acre of vegetated slope; construction of new school facilities; and reopening the property to accommodate a maximum enrollment capacity of 510 elementary students. A surface parking lot with 41 stalls would be developed on the western side of the campus, and vehicle access would be provided from 25th Street. A two-story classroom building is proposed along 25th Street, and a multipurpose building is proposed along 26th Street near Morningside Dr. An asphalt playground would be developed between the two buildings, and a natural field would be installed on the eastern side of the campus. The proposed improvements would be funded by measure S, which was approved by the District's constituents in June 206; the District Plans to apply for matching state bond dollars through the state school facilities program.
Contact Information
Name
Pat Escalante
Agency Name
Hermosa Beach City School District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Hermosa Beach
Counties
Los Angeles
Cross Streets
417 25th St, south of 26th St, and Myrtle Ave
Zip
90254
Total Acres
2.35
Parcel #
4182-028-900, -902
State Highways
Pacific Coast Hwy
Schools
Hermosa Valley ES, Robinson ES
Waterways
Pacific Ocean
Notice of Determination
Approving Agency
Hermosa Beach City School District Board of Education
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.