Manor Street Bridge Rehabilitation and Seismic Retrofit Project

3 Documents in Project

Summary

SCH Number
2017021001
Lead Agency
Bakersfield, City of (City of Bakersfield)
Document Title
Manor Street Bridge Rehabilitation and Seismic Retrofit Project
Document Type
NOD - Notice of Determination
Received
Posted
4/21/2017
Present Land Use
Z: NA City ROW/GP: NA City ROW

Document Description
The city is proposing to rehabilitate and upgrade the Manor St Bridge at the Kern River to increase bridge safety, provide for a seismic retrofit, and improve roadway geometrics. The primary purposes of the project is to enhance the bridge pedestrian and vehicular safety, through seismic retrofit and roadway geometrics improvements to meet current seismic safety standards and AASITO geometric standards. The proposed project consists of widening the bridge to accommodate two 12-foot lanes, a 2 foot left shoulder, a 6 foot right shoulder, a 6-foot sidewalk and standard barriers. The total project site is approx.. 3 acres, with two proposed potential staging areas.

Contact Information
Navdip Grewal
City of Bakersfield
1501 Truxton Ave
Bakersfield, CA 93301

Phone : (661) 326-3361

Location

Coordinates
35°24'27"N 119°0'35.4"W
Cities
Bakersfield
Counties
Kern
Cross Streets
Manor St between E. Roberts Lane and Denise Ave
Zip
93308
Total Acres
3
State Highways
99
Schools
Highland ES, Standard
Waterways
Kern River
Township
29S
Range
28E
Section
18
Base
MBDM

Notice of Determination

Approving Agency
City of Bakersfield
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
1501 Truxton Ave., Bakersfield, CA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search