Phase 2 Geotechnical Investigation - CA High-Speed Rail Project San Jose to Merced
Summary
- SCH Number
- 2017018426
- Lead Agency
- High Speed Rail Authority, California (California High Speed Rail Authority)
- Document Title
- Phase 2 Geotechnical Investigation - CA High-Speed Rail Project San Jose to Merced
- Document Type
- NOE - Notice of Exemption
- Received
- Posted
- 1/30/2017
- Document Description
- Activities include rock core drilling within the public road right of way. Piezometers might be installed for long-term groundwater monitoring.
- Contact Information
-
Mark McLoughlin
California High Speed Rail Authority
777 L Street, Suite 800,
Sacramento, CA 95814
Phone : (916) 403-6934
Location
- Counties
- Santa Clara
Notice of Exemption
- Exempt Status
- Categorical Exemption
- Type, Section or Code
- S:15304,15306 C:4,6
- Reasons for Exemption
- The project consists of geotechnical data collection that will not result in a significant effect on the environment because the geotechnical investigation will be performed on disturbed land surface in public road right of way, will be temporary in duration, and the minor alteration to the land will be restored to its original surface condition.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.