Operation of El Toro Water District Existing Reservoir Management Systems

Summary

SCH Number
2017018287
Public Agency
State Water Resources Control Board
Document Title
Operation of El Toro Water District Existing Reservoir Management Systems
Document Type
NOE - Notice of Exemption
Received
Posted
1/19/2017
Document Description
The State Water Resource Control Board (State Water Board) as the lead agency will be issuing a water supply permit. The Reservoir Management Systems project, constructed in February 2016, consisted of the construction of a new, separate 390 ft2 15 feet tall masonry block building and mechanical and electrical facilities for injection of chloramines and tank mixing systems. The ammonia system includes a thermostat with exhaust fan, an ammonia storage tank, metering pumps for ammonia, 1/2-inch and 3/8-inch chemical feed tubing, tank suction lines, and tank vents.

Contact Information

Name
Oliver Pacifico
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Laguna Woods
Counties
Orange

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301 - Class 1
Reasons for Exemption
Existing facilities.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print