Sutter Union High School Additions Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017012059
- Lead Agency
- Sutter Union High School District
- Document Title
- Sutter Union High School Additions Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/14/2017
- Present Land Use
- School/public and open space/public
- Document Description
- The proposed project includes the construction of two new buildings (a two-story classroom building and restroom/snack bar facility), installation of athletic grandstands, and improvements to the track and turf field at the existing Sutter Union High School campus in the community of Sutter, CA. The largest proposed building is a two-story classroom building totaling approximately 19,650 sf, and located on an existing athletic field north of Griffith Avenue. The second building includes an approximately 1,200 sf restroom and snack bar building located northwest of the existing football field and athletic track.
- Contact Information
-
Ryan Robinson
Sutter Union High School District
2665 Acacia Avenue
Sutter, CA 95982
Phone : 530-822-5161 x205
Location
- Coordinates
- 39°09'57"N 121°45'21"W
- Counties
- Sutter
- Cross Streets
- Acacia Ave and Griffith St
- Zip
- 95982
- Total Acres
- 4.28
- Parcel #
- 013-200-062
- State Highways
- 20
- Schools
- Brittan ES
- Waterways
- Wadsworth Canal, W Interception Canal
- Township
- 15N
- Range
- 2E
- Section
- 9
Notice of Determination
- Approving Agency
- Sutter Union High School
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 2665 Acacia Ave., Sutter, CA
Determinations
- (1) The project will have a significant impact on the environment
- N/A
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- N/A
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.