Antonio Mountain Ranch Mitigation Bank (Streambed Alteration Agreement No. 1600-2017-0242-R2)
5 Documents in Project
Summary
SCH Number
2017012040
Lead Agency
Placer County
Document Title
Antonio Mountain Ranch Mitigation Bank (Streambed Alteration Agreement No. 1600-2017-0242-R2)
Document Type
NOD - Notice of Determination
Received
Posted
6/20/2018
Present Land Use
F-B-X-SP 80 AC Min; F-B-X-DR 80 AC Min; F-B-X 80 AC Min; O/ Industrial; open space
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 160-2017-0242-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Lewis Antonio Mountain Ranch, LLC.
Project is limited to establishment of floodplain seasonal wetlands above top of bank and their hydrological connections below top of bank located in the low terrace floodplain along Orchard Creek and the unnamed tributary to Orchard Creek, establishment of a 533 linear foot (LF) intermittent stream and its hydrological connections to the unnamed tributary to Orchard Creek, and establishment of riparian and marsh habitat. The project will also install temporary stream crossings and erosion control measures located in eleven areas within the Antonio Mountain Ranch Mitigation Bank (Bank).
Contact Information
Name
Stephanie Buss
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Cities
Lincoln
Counties
Placer
Cross Streets
Athens Ave and Fiddyment Rd
Parcel #
021-283-001, 012, 013, 021
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.