Oak Hill Road at Squaw Creek Bridge Replacement Project (Streambed Alteration Agreement No. 1600-2018-0291-R2)
6 Documents in Project
Summary
SCH Number
2017012034
Lead Agency
El Dorado County
Document Title
Oak Hill Road at Squaw Creek Bridge Replacement Project (Streambed Alteration Agreement No. 1600-2018-0291-R2)
Document Type
NOD - Notice of Determination
Received
Posted
2/25/2019
Present Land Use
rural and low density residential land use surrounding road ROW; residential estate zone
Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2018-0291-R2, pursuant to section 1602 of the Fish and Game code to the project Applicant, El Dorado County Community Development Agency.
The project is limited to replacing an existing two-lane 19.6 foot wide and 24 foot long reinforced concrete deck/girder with a new bridge. The new bridge, which will be located slightly west of the existing bridge, will have two 12-foot wide travel lanes with 3-foot wide shoulders on each side. The vertical alignment of the bridge may raise approx. 5 feet. The foundation of the new bridge will consist of spread footings. The bridge abutments will be located on the banks of Squaw Hollow Creek and will not be in the active channel. Rock slope protection may be placed around the new abutments to protect them from scouring and erosion. Excavation for the abutments is not expected to exceed approx. 20 feet below the existing ground surface. Eleven alder trees and one oak will be removed from the banks of Squaw Hollow Creek.
If necessary to avoid work in flowing water, a temporary diversion dam and piping may be used to divert stream flows around the work area.
Contact Information
Name
Gabriele Quillman
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Placerville
Counties
El Dorado
Cross Streets
Oak Hill Rd and Pleasant Valley Rd
Zip
95667
Total Acres
6.12
Waterways
Squaw Hollow Creek
Township
10N
Range
11E
Section
33
Base
MDBM
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.