Oak Hill Road at Squaw Hollow Creek Bridge (No. 25C0096) Replacement Project

6 Documents in Project

Summary

SCH Number
2017012034
Lead Agency
El Dorado County
Document Title
Oak Hill Road at Squaw Hollow Creek Bridge (No. 25C0096) Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/28/2017
Present Land Use
rural and low density residential land use surrounding road ROW; residential estate zone
Document Description
El Dorado County is proposing to replace Bridge Number 25C0096 over Squaw Hollow Creek on Oak Hill Road. The existing Squaw Hollow Creek bridge, built in 1945, would be replaced with a new standard two-lane bridge approximately 32 feet wide and 32 feet long. In addition, approximately 810 feet of Oak Hill Road would be reconstructed. A temporary diversion dam would be placed in Squaw Hollow Creek upstream of the bridge to divert flows around the work area during bridge construction. One lane along Oak Hill Road near the bridge would be open during bridge replacement to allow through traffic.

Contact Information

Name
Donna Keeler
Agency Name
El Dorado County
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Oak Hill Rd and Pleasant Valley Rd
Zip
95667
Total Acres
6.12
Waterways
Squaw Hollow Creek
Township
10N
Range
11E
Section
33
Base
MDBM
Other Location Info
Tiger Lily

Notice of Determination

Approving Agency
El Dorado County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes