Rocky Quarry Development Project

3 Documents in Project

Summary

SCH Number
2017012028
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Rocky Quarry Development Project
Document Type
NOD - Notice of Determination
Received
Posted
3/23/2017
Present Land Use
state forest lands/timberland/forest lands
Document Description
The proposed project consists of developing two new rock quarry sites and the continuation of one other existing quarry site within CalFire state forest. The project will involve the removal of vegetation and top soils off the surface of slopes and excavate hard rock for processing into rock products that can be used to maintain and improve Jackson Demonstration State Forest roads. The use of the existing quarry will involve the continuation of excavation of hard rock and processing for use on JDSF roads. Quarry soils and processed rock will be transported and stored in locations where they will be used or are accessible to heavy equipment during all times of the year. When the quarry sites have been completely exhausted of viable hard rock, then the sites will be reclaimed by importing soils back into the quarry, re-contouring the slopes and planting with native trees and vegetation.

Contact Information

Name
Christina Snow
Agency Name
Cal Fire
Contact Types
Lead/Public Agency

Location

Cities
Fort Bragg
Counties
Mendocino
Cross Streets
Hwy 20
Zip
95437
Total Acres
varies
Parcel #
several
State Highways
20
Township
17N
Range
17W
Section
14
Base
MDBM

Notice of Determination

Approving Agency
CA Dept. OF Forestry and Fire Protection
Approving Agency Role
Lead Agency

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print