Former Naval Petroleum Reserve No. 1: Remediation of Areas of Concern
15 Documents in Project
Summary
SCH Number
2017012006
Lead Agency
California Department of Toxic Substances Control
(DTSC)
Document Title
Former Naval Petroleum Reserve No. 1: Remediation of Areas of Concern
Document Type
NOD - Notice of Determination
Received
Posted
7/30/2018
Document Description
DTSC is considering approval of five Removal action work plans for the former Naval Petroleum Reserve No. 1 (NPR-1), CA, (hereinafter "the Site"). The five RAWs are for Areas of Concern (AOC) 033-007, AOC 048, AOC 056 DU06, AOCs 060 and 104 (combined), and AOC 125-013. The RAWs contain proposals to excavate impacted soil with concentrations of chemicals of concern (COCs) at levels that may pose a risk to human health and the environment. DTSC has regulatory authority to approve this action pursuant to CA Health and Safety Code, Ch. 6.5. The US Dept. of Energy has also identified an additional 53 AOCs or AOC subareas within the former NPR-1 which will require remediation and preparation of subsequent RAWs or RAPs. DTSC has regulatory authority for these subsequent approvals pursuant to CA Health and Safety Code, Ch. 6.5. Consistent with the Corrective Action Consent Agreement (DTSC, 2008), signed by DOE and DTSC in 2008, the preferred removal action alternatives that are ultimately selected for the proposed RAWs and RAPs for the 59 AOCs for AOC subareas will include actions that will limit short-term and long-term exposure to COCs.
Contact Information
Name
Tom Berg
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Bakersfield
Counties
Kern
Cross Streets
Highway 119
Zip
93268
Total Acres
47,000
State Highways
119
Schools
Tupman ES
Waterways
California Aqueduct
Township
30S
Range
22E
Section
24
Base
MD
Other Location Info
Tupman
Notice of Determination
Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No