Former Cogen Landfill Gas Extraction System and Monitoring Plan Project
Document Type
NOD - Notice of Determination
Received
Posted
3/15/2018
Present Land Use
portion of former Cogen Landfill/office professional/employment-technology; public ROW; water tank pad/public/institutional
Document Description
The project would involve (1) the installation and operation of a landfill gas extraction system, composed of a media bed treatment system connected by piping to up to five extraction wells; (2) the installation of two new LFG monitoring wells at the top of the slope in the northwestern portion of the landfill ; and (3) subsequent monitoring of LFG emissions from the county-owned portion of the landfill at six well locations and at surface locations with subsequent reporting to the local enforcement agency. There may be an off site electrical connection extending across Sheriff Road. The two new monitoring wells would be installed in or around July 2019, prior to construction of the LFG Extraction System from August 2019 through March 2020, including one month to allow for contingencies.

Contact Information

Name
Fred Ganjian
Agency Name
Los Angeles County
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Cross Streets
Sheriff Rd/Ameron Way, Rollins Dr/Loren St
Zip
91331
Total Acres
4.6
Parcel #
5225-031-917
State Highways
I-710, I-10
Railways
Metrolink, UPRR
Schools
Several
Waterways
Laguna Channel
Other Location Info
Monterey Park, city Terrace

Notice of Determination

Approving Agency
County of LA
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.