CUP-S-778

4 Documents in Project

Summary

SCH Number
2017011030
Lead Agency
City of Simi Valley
Document Title
CUP-S-778
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2017
Present Land Use
Vacant-concrete product storage/general industrial with SB overlay/general industrial
Document Description
To authorize and construct an outdoor storage yard for recycled concrete and concrete products on a 6.6 acre parcel located on W LA Ave. approx. 4,500 feet west of Madera Road. The site is associated with the main Pre-Con manufacturing plant located adjacent to 240 W LA Ave., and the project will be an accessory use to the main facility. The project includes grading and filling of the site, preservation of a majority of existing oak trees, installation of underground drainage facilities to replace an existing surface drainage channel, with a landscaped escape route for wildlife to minimize potential disturbance to movement under LA Ave., grading and re-vegetation of a slope.

Contact Information

Name
Tom Preece
Agency Name
City of Simi Valley
Contact Types
Lead/Public Agency

Location

Cities
Simi Valley
Counties
Ventura
Cross Streets
West LA Avenue approx. 4600 ft west of Madera Rd
Zip
93065
Total Acres
6.6
Parcel #
579-0-050-205
State Highways
118
Railways
SPRR
Waterways
Arroyo Simi

Notice of Determination

Approving Agency
City of Simi Valley
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.