Knowleton Communities TTM 33135 Project (Streambed Alteration Agreement No. 1600-2013-0152-R6)

2 Documents in Project

Summary

SCH Number
2016129019
Lead Agency
City of Corona
Document Title
Knowleton Communities TTM 33135 Project (Streambed Alteration Agreement No. 1600-2013-0152-R6)
Document Type
NOD - Notice of Determination
Received
Posted
12/23/2016
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2013-0152-R6, pursuant to section 1602 of the Fish and Game Code to project Applicant, Knowleton Communities. The project is limited to the construction of 62 single-family units and associated roadways and infrastructure. One four-arched culvert road crossing and drop structure, one two-arched culvert road crossing and drop structure, and four storm drain outlets, two with grouted riprap energy dissipation structures, will be constructed within Tin Mine Canyon Creek, and the entirety of the south bank will be fortified with soil cement, which will be buried with soil. A concrete Arizona crossing and the existing drop structure will be repaired, a temporary access road will be constructed across Hagedor Canyon Creek, and two storm drain outlets will be installed. Two unnamed drainages from the Cleveland National Forest will be regraded and diverted into the debris basin and one unnamed drainage will be graded to construct a U.S. Forest Service access road.

Contact Information

Name
Claire Ingel
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Corona
Counties
Riverside

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.