Apple Valley Reclaimed Water Phase 1 Delivery Infrastructure

Summary

SCH Number
2016128098
Public Agency
City of Apple Valley
Document Title
Apple Valley Reclaimed Water Phase 1 Delivery Infrastructure
Document Type
NOE - Notice of Exemption
Received
Posted
12/8/2016
Document Description
The Town of Apple Valley will install pipeline infrastructure to collect up to 1 million gallons of reclaimed water from the sub-regional water reclamation plant. The Apple Valley Water Reclamation Plant is currently under construction and is owned and will be operated by the Victor Valley Waste Water Authority. The Reclamation Plant project includes main collection lines that redirect the overflow from the plant to the overflow ponds within the Town owned municipal golf course. This project will install reclaimed water interties to connect to the main reclaimed water pipeline to deliver reclaimed water to five proposed sites.

Contact Information

Name
Carol Miller
Agency Name
City of Apple Valley
Contact Types
Lead/Public Agency

Location

Cities
Apple Valley
Counties
San Bernardino

Notice of Exemption

Exempt Status
Statutory Exemption
Type, Section or Code
210080.08(a)(1) and (2)
Reasons for Exemption
Construction of a recycled water pipeline within existing rights of way and is directly related to the conservation of groundwater leading to gorundwater replenishment.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print