Pleasant Grove Wastewater Treatment Plant Expansion and Energy Recovery Project (Project); Clean Water State Revolving Fund (CWSRF) NO. C-06-8215-110
6 Documents in Project
Summary
SCH Number
2016122040
Lead Agency
City of Roseville
Document Title
Pleasant Grove Wastewater Treatment Plant Expansion and Energy Recovery Project (Project); Clean Water State Revolving Fund (CWSRF) NO. C-06-8215-110
Document Type
NOD - Notice of Determination
Received
Posted
2/25/2020
Document Description
The City proposes to expand and increase treatment capacity of the existing PGWWTP so that it can meet its original 12 million gallons per day (MGD) design capacity. The expansion portion of the Project will increase the current average dry weather flow at the PGWWTP by 2.5 MGD. The City will also be constructing new energy recovery facilities that would beneficially utilize the digester gas produced by anaerobic digestion that is included in the expansion of the PGWWTP. The energy recovery facilities will also generate fuel for solid waste trucks, generate electricity, and provide heating for the anaerobic digesters.
Contact Information
Name
Caitlyn Oswalt
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Roseville
Counties
Placer
Other Location Info
The Project is located within and adjacent to the existing Pleasant Grove Wastewater Treatment Plant (PGWWTP) at 5051 Westpark Drive in the City limits. The existing PGWWTP is on a 110-acre parcel, located approximately 1.5 miles west of Sierra Pines Golf Course, north of Pleasant Grove Boulevard, and south of Blue Oaks Boulevard. The energy recovery facilities would be constructed on City-owned property, intended for future wastewater treatment infrastructure and deeded to the City as part of the West Roseville Specific Plan. This 20.5-acre property (also referred to as the Southern Expansion Area) is located adjacent to, and immediately south of, the existing PGWWTP.
Notice of Determination
Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.