Wharves 3 & 4 Fender Replacement (Lake or Streambed Alteration Agreement No. 1600-2017-0043-R3)
2 Documents in Project
Summary
SCH Number
2016122039
Lead Agency
Port of Redwood City
Document Title
Wharves 3 & 4 Fender Replacement (Lake or Streambed Alteration Agreement No. 1600-2017-0043-R3)
Document Type
NOD - Notice of Determination
Received
Posted
7/21/2017
Present Land Use
GP: Industrial-port related; Z: GI
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0043-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Don Snaman/Port of Redwood City.
Project includes demolishing/removal, and replacement of the fender systems at Wharves 3 and 4 and connecting walkways. Removal includes 111 creosote-treated timber piles; replacement include nine 66 inch diameter pile supported dolphins near Wharf 3 using vibratory and impact hammers; both wharves will have energy absorbing rubber fenders mounted tot eh face of the dolphins; the new walkways will be 10 feet wide and includes 120-foot lengths of steel supported by ten 30-inch steel piles.
Contact Information
Name
JHeanne Wetzel Chinn
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Redwood City
Counties
San Mateo
Cross Streets
Seaport Blvd
Zip
94063
Parcel #
054-300-530
State Highways
101
Railways
UPRR
Schools
Summit Prep HS
Waterways
Redwood Creek, SF Bay
Township
5S
Range
3W
Base
MD
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.