City of Pacifica Wet Weather Flow Equalization Basin Project

3 Documents in Project

Summary

SCH Number
2016122016
Lead Agency
Pacifica, City of (City of Pacifica)
Document Title
City of Pacifica Wet Weather Flow Equalization Basin Project
Document Type
NOD - Notice of Determination
Received

Document Description
The project would consist of the construction of: a 2.1-million gallon capacity equalization basin, two diversion structures to passively divert excess flows from the existing Linda Mar and Arguello sanitary sewer lines and transport the flow via a conveyance pipeline to the EQ basin during storm events, an effluent conveyance pipeline routing flows to the existing Crespi Drive sanitary sewer line and Linda Mar Blvd. pump station, a 10-foot tall motor control center building that is equipped with a 4-ft high metal antenna that would allow radio communication with the city's Calera Waste Water Treatment Plant and the Linda Mar Pump Station, a ventilation and odor-control system, and a potable-water supplied cleaning system within the EQ basin. The EQ basin would be located within the parking lot for the city of Pacifica's Skatepark located at 540 Crespi Drive.

Contact Information
Bonny O'Connor
City of Pacifica
1800 Francisco Blvd
Pacifica, CA 94044

(650) 738-7341

Location

Coordinates
37°35'52"N 122°30'00"W
Cities
Pacifica
Counties
San Mateo
Cross Streets
Crespi Dr and SR 1
Zip
94044
Total Acres
1.0
Parcel #
022162420
State Highways
1
Schools
Various
Waterways
Pacific Ocean, San Pedro Creek

Notice of Determination

Approving Agency
City of Pacifica
Approved On
Final EIR Available Location
http://www.cityofpacifica.ca.org/depts/planning/environmental_documents/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search